Brand: LUMILEDSLED
Effect: High efficiency 130LPW LED
Driver: Sosen surge protection: 12KV
Beam angle: 90°;Ⅱ/Ⅲ/Ⅳ/Ⅴoptical lens IP/IK
Rating: IP65/IK08
Install: Skater / square bar / round bar / bracket
Control device: Solar sensor / microwave sensor
Scope of application: Shopping malls, roads, gymnasiums, hotels and other lighting applications
SK unit |
XJX-SH075 |
XJX-SH100 |
XJX-SH150 |
XJX-SH200 |
XJX-SH300 |
Watt value |
75W |
100W |
150W |
200W |
300W |
Output lumen tube |
10400lm |
13000lm |
19500lm |
26000lm |
39000lm |
power factor |
>0.95 |
>0.95 |
>0.95 |
>0.95 |
>0.95 |
Effectiveness |
130lm/w |
||||
Input voltage |
100-277VAC |
||||
Lightning protection |
12KV |
||||
Color temperature |
3000K/4000K/5000K/5700K/6500K |
||||
Color rendering index |
>70(>80 optics) |
||||
Shell color |
Dark grey |
||||
Shell material |
Aluminum, PC lens |
||||
Action environment |
-30℃~50℃;relative humidity:10%~90% |
||||
Service life |
>50000 hour(LM80) |
||||
Defects liability period |
5 years |
Product advantages :
Efficient heat dissipation Thickened integrated diecasting radiator, selectedmaterial Multichip designfast heat dssipation,high heat transfer performance,smaltemperatre diferencebetween upper andlower.
FAQ:
1.Q:Can I have a sample order?
A:Yes, we are also very happy to order samples with our customers.
2.Q:What are your payment terms?
A: usually, we accept T / T, irrevocable L / C at sight. For regular orders, the payment terms are 30% down payment and full payment before delivery.
3.Q:How long is the delivery time of the order?
A:It depends on the quantity of the order. Generally, it takes about 7-10 days to receive a small deposit. It takes 20-25 days to order in bulk (more than 10000 units per watt).
http://www.aeroledlights.com/